Introducing Acumatica Cloud ERP: 2026R1
Bill of Material. MRP, Production Management, Product Configuration
Recently active
Our business creates seed mixes via the manufacturing process.The ingredients for the mixes have base units of “EA” or “each” because we purchase and sell the bags by the bag (not by weight). Each ingredient comes in bags that weigh 50 pounds.I have the following BoM to create 1# of the seeds mix:Ingredient 1 - 0.4# (0.008 of a 50 pound bag)Ingredient 2 - 0.4# (0.008 of a 50 pound bag)Ingredient 3 - 0.2# (0.004 of a 50 pound bag)Inventory wise this math works perfectly and I’m able to do a production order flawlessly in the system.BUTOn the production order ticket it displays/tells workers to use 0.008 of a 50# bag and ideally I would want it to tell the worker how many POUNDS to use. I can’t change UoMs of the ingredient stock items.Originally I was going to create a second stock item for each ingredient and call them “Ingredient # BULK” with UoMs as pounds and create BoMs to convert 50# bags (EACH) into Bulk pounds and THEN create a BoM for the mix using the BULK stock items... but t
Hello, Date range runs out to 8-2-24.In the production order pane, I can scroll to the right, but no all the way to 8-2-24.
Hi All,I am new to manufacturing. What is the process of disassembling of a closed production order with serialized items? thxDries
Trying to build a GI or maybe a report, that can quickly show me items and when they were produced. Is there a table somewhere that captures when a order changes status? I’d like to see the date that certain Work Orders were completed.
Hello Experts, how to resolve this error.
I am testing automatic forecast generation for a client that has been live for a year. I am testing in 2022 R1.We previously uploaded manual forecasts since the client did not have any actual sales data to generate forecasts automatically. The forecast calculation is simple...10% growth per month. I am able to calculate the forecast however when I process the data, the forecast listing shows the items with an interval of One Time and they appear to be in addition to the old forecasts. The previous forecasts were entered with the interval Monthly. My questions are as follows:Is it possible to process the generated forecast with the interval of monthly and automatically update previously entered forecasts?What is the implication of one time vs monthly?There does not seem to be a way to easily mass delete old forecasts. I have thousands of lines as there are different forecasts by item by month and deleting one by one is not realistic.
In inventory planning display, we can only select multiple items for purchase if they are for the same vendor. We would like to select all lines, click “PURCHASE”, and have multiple POs created. 1 for each primary vendor with the relevant items on the PO lines.It is too cumbersome to select items for one vendor, hit purchase, then repeat for each vendor in the list.Is there anything that helps with this process or is this an enhancement request?
I am wondering if there is any way to do a BOM cost roll using Average Cost. For example, we need to be able to provide pricing to customers before we publish the new pricing but need a way to find out the new BOM cost with a pending price. Since we have not purchased anything at the “new/pending” cost, it is difficult for us to accurately provide new pricing for finished goods from a BOM.Is there any way that we can do this in Acumatica?Thanks
Client is creating the production order the day before the actual production run estimating how many cases will be produced so they can print off the FG bar codes. They are also setting up the release of materials so the raw pallets and caps can be scanned in real time. The issue is that they cannot change the number of cases produced after the release of materials is made (without deleting the release of materials, which defeats the purpose of scanning real time) they wont know the exact number of cases produced until after the shift is done producing. Any thoughts on how to change the production work order flow that allows one order per shift and the modification of the produced qty in that work order before completing production order in system.
We run 23R2, Build 23.209.0023. When attempting to use the Finish action via the ConfigurationEntry endpoint, the Supplemental Item does not appear on the Sales Order. This is not the same behavior we see when manually creating an SO, where after closing a Finished Configuration, the SO is updated to include the Supplemental Item.Has anyone else had success with the Finish action that’s part of the ConfigurationEntry endpoint? It is properly updating the Configured Item’s Line Description.
I have an odd question. We have part ABC123. This part is sometimes manufactured and has a BOM; sometimes, we purchase it from an outside vendor. Our engineering team wants to be able to use the same part number but two BOMs. I question if this is a good idea. Others might have similar scenarios and would love feedback on how they deal with them. The gist is we save money but have an extended lead time on the purchased item so in some cases, we end up making the item.
Getting unexpected results. Anyone have any insight they can share?Both planned and actual labor are incorrect
We encountered a glitch when receiving partial quantities:Production Order Qty 10 with Qty 10 Subcontract Material Purchase Order for Subcontract Matl Qty 10Purchase Receipt for Subcontract Matl Qty 5 (Subcontract Matl is Lot/Serial tracked to preserve costing from a specific vendor to form the PN) Move on Production Order Qty 5 (consumes backflushed Subcontract Matl Qty 5) Production Receipt only capitalizes 1/2 of the Subcontract Matl cost into the finished good. WIP balance is correct, though.What do we have set up incorrectly? Or is this a bug?
We use the MRP Planning method for one of our warehouses but Inventory Planning for our replenishment from the suppliers. We used to be able to do this in the older versions but with 23R2 they have taken to function away. Does anyone know how I might be able to get around this? Here is the use case:One of our warehouses is the aftermarket warehouse. This warehouse does not replenish from the supplier unless our OEM warehouses does not carry the item sold. In most cases they are transferring items from the other warehouses to it using the MRP Display (Now Inventory Planning Display). With 23R2 you have to choose one inventory planning method for an item, and at our OEM warehouses we want to use the Inventory Planning method, but when you do that, those items fall off the MRP Display.
Hello everyone,I need to create many purchase orders for a production order.How can I do that because the system only allows to create one purchase order and if I change the quantity, it does not suggest to create another purchase order. Thank you in advance.
Hello, I need to specify total hours and fixed rate instead of employees ID and shift Is this option available in labor screen (AM301000) version 2023 R2 ?
I have a question on MRP Types. I have certain stock items that are managed on a min/max basis. Screws, for example, I just want to maintain an inventory level but don’t really care which unit of production they go in to. The screws are on the BOM, so when I run MRP these items show up to purchase twice. One purchase suggestion is triggered by the Reorder Point, which is what I want. However, another purchase suggestion is triggered by Production Material, which I don’t want.Is there a setting within the Stock Item or possibly MRP Preferences that allows me to only use Reorder Point for MRP and not Production demand for items with a Min/Max replenishment method?
Hi,Does anyone know if there is the possibility to count the # of lines in this screen in the lower toolbar like on GI’s? We are on 22R2 but upgrading to 24R1 shortly.
Good day everyone, Need some help or suggestions. We are on 2024R1 and the BOM ID Number is limited to 15 characters. THe Item inventroy ID came go up to 30 characters. We typiclly use the top level inventory id number to be the same as the BOM. Unfortuntily, we are running into problems. We have over 60,000 BOM now and we growing. I am hoping for a suggestion before we start looking for an outside solution . Thank you Kim
Is there a way to “close” multiple completed production tickets base on close date? For example, I would like to close all completed production tickets that were completed between 01/01/2023 to 03/31/2023.
While doing production, some quantities are scraped. A new production order should be created for such scraped quantities with reference to existing production order. Is it possible to create new production order for the scrapped quantities with reference to existing production order?
Set up:Client has 2 warehouses, MAIN and NRD All orders are shipped from MAIN, no exceptions. Certain Items are manufactured in NRD. Sales Order Lines are always created for the MAIN warehouse Sales Order Line Item is Marked for ProductionWorkflowProduction Manager (PM) creates MFG Work Order (WO) The new WO has MAIN warehouse, copied from the linked SO PM decides if the Item needs to be produced in NRD PM changes the WO warehouse to NRD System prompts the user if the SO Line should be changed to NRD PM selects NO (see step #11) At this point the WO is pointing to NRD and the SO Line to MAIN WO is completed Item is transported from NRD to MAIN and a 1-Step Inventory Transfer is released. Issue: The shipping team does not have visibility since the Order is not included in the Process Order screen SO501000 so Shipments are being missed If user opens SO to create Shipment: Error persists even after: User unlinks the WO from the SO Line User unchecks the Mark for Production in the
Can I change the setting on the clipboard copy function, When I copy a SO it will copy everything and I don’t want the notes or date to copy over.
Hello Community! Has anyone combined or have a way to combine the Multi Level BOM reports Engineering & Costed Into One Report? Any advice would be helpful!
Hi guys, I have been introducing the packing feature to our factory staff and training them up on this.I have been experiencing an issue where when the shipment is open, and a run of production is complete, the produced items OCCASIONALY do not allocate to the sales order and therefore cannot be added to the shipment. Has anyone else experienced this? Thanks all, Aleks
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.