I am trying to configure my stock item’s (Item A) inventory planning settings to create a single production order based on available inventory of the item being used to create Item A (Item B) and open sales orders for Item A.According to current sales orders I need manufacture 16 Item AItem A has the current Inventory Planning Settings (I have double checked to make sure the warehouse details for this item are the same)Planning Method: MRPSource: ManufacturingMin Order Size: 0Max Order Size: 1000Lot Size: 0I have tried a wide array of settings and so far haven’t been able to reach my goal.Thanks!
Hi I’m trying to create a by-product and per the instructions it says select in BOM but I don’t seem to see that as an option? Only have “regular, Phantome or subcontract” Anyone else have this as a problem? Am i looking in the wrong field? Missing something in setup?
I'm creating an Estimate in AM303000 screen.While adding Operations in the details, the Backflush Labor check should be copied from Workcenter in the detail line.I have created several workcenters with the Backflush Labor check selected but when I added to the operation, the check it's always cleared.According to documentation this should work as is working in Bill of Material screen. I'm using 23R2 version.This is estimateThe check selected for Backflush in WorkcenterI need this check automatically copied from Workcenter in every estimate.
This question was asked by a fellow member (@eric82) years ago, and I have not been able to find the solution to this answer as I am relatively new to Acumatica and would like to know what is causing this and how to correct it.Does anyone have any feedback that may explain why the item descriptions don’t update on stock items automatically?
For very small BOM trees (5-10 total leaf nodes) Engineering Workbench is a pretty decent implementation given the constraints of web development.But if you get a more complex BOM tree, it grinds to a halt. Takes significantly longer than Visual BOM screen (which is effectively doing the same data pull). Also, if you move the slider too fast, it will “lose” it’s tree icon details (though the extra columns stay) and struggle to repaint; sometimes browser locks up. This happens on multiple browsers, clean cookies, etc.Are there optimizations I can take advantage of to make this usable? Also, as an improvement request, since it doesn’t allow adding children to a subassembly (which seems like a strange implementation constraint, but I think I understand why it was done) could we get an easy “double-click to drill-down” option, or at least expose a “navigate to this BOM” on the leaf node’s “…” menu. Very concerned that Visual BOM is being deprecated when this isn’t close to being productio
hello all,I have been working on production orders. I have an item that has been received in the qty of 377, and then when I went ahead to create prod orders out of this 377, it shown me out of stock item.Highlighted below.Item ID : 00031381: The first line has the available qty of 272 which is fine, but for the one that is highlighted it shows incorrect release & avail qty. whereas out of 377, 270 has been used in the Prod order no. 1506 so I still have 105 available. But it doesnt show up in the highlighted line.But if I go to manually add up the item in the Material transaction it allows me to add up the figure same as that of required qty. for highlighted prod order.
Hi all, We are implementing the manufacturing module in about 3 weeks and had a scenario come up that I’m unsure of the best way to handle. We use production orders for sampling new products. We need to be able to log material and labor transactions against the production order, but we do not want the parts to stock into inventory. I tried to adjust some settings but haven’t found anything that lets us do this. Any ideas? Thanks!
We went live with our inventory system in Acumatica in January of 2022 and every single month we have dealt with unreleased production transactions against jobs that are already closed. We found out that when you approve the last step of the production order it automatically marks it complete. I believe this should not be possible, especially if there are unreleased transactions against it.Acumatica has tons of checks and balances before marking anything complete and I think that a production order should not be able to go into complete status until everything has been released. Just like Acumatica won’t let you release an entry without matching debits and credits, this should also be implemented for Inventory.
How do users manage tooling? For instance, I’d like to understand which parts use specific manufacturing tools. Like a where used for tooling? I see where others suggest incorporating tools, templates, jigs and fixtures into “stock items” (this a hokey solution and not how to use an ERP). Additionally, I see where certain parts or BOM’s can “consume” tooling (assume that this is for machine tooling consumable cost capture), but how do non-consumable tools get cost accounted and managed long term for inventory and tracking within Acumatica? In short - there should be a backend tooling data base and a way to pull a “where used” to see which parts tools are tied to.
We recently upgraded to 24R2 and when I was trying to complete a move transaction on a lot of material, it would throw the below trace error. I was able to successfully complete both labor and material issue transactions with out any issues, but it seems like the move function is simply no longer functional.
It is my understanding in Acumatica Labor Overhead is not calculated unless you apply a qty to an operation. It is also my understanding that this qty triggers a “move” (but not into inventory) operation which kicks off the Labor over head calculation. Which is fine in many cases however in some case you have long run assembly time where you might be on an operation for a long period of time. The pitfall here is you will not be able to track the labor dollars effectively until you post a qty complete to an operation (even if that operation may not be complete in reality). Couldn’t this behavior just be a preference to allow the labor transaction to trigger the overhead? Even if the qty complete it posted as 0? I hope that all makes sense.
We have lots of items that need to be marked for production, but I don't want our sales team to have to understand when to do this and when not to. I've utilized the "Make to Order Item" checkbox on the stock item screen and that works great. However, when placing an item on a quote, it does not automatically mark for production. No problem because it's just a quote at this stage. However, when we copy the quote to a sales order, I want all items to automatically mark for production. Is it possible to do this?
Problem: When a production order is created for a configured item, the “Mark for PO” box does not get checked on production materials that have the “Dflt. Mark For” value set to “Purchase” on the inventory item record. This means that no purchase demand will show up on the “Create Purchase Orders” screen and the purchasing manager will not be aware of any custom order materials that are required until production employees are ready to perform the operation and discover that materials have not been ordered.Affected Versions:2024R2 (all builds, as far as I am aware)Simple Workaround:Immediately upon learning of this problem, I created a Generic Inquiry to enable a user to easily view affected records. This displays Production Material lines where Mark For PO is false, but the Dflt Mark For value on the inventory item is Purchase. This is great, but potentially a lot of work, since it has to be reviewed regularly and requires a manual correction. I’ve attached the GI below, in case any ot
How do you create a default part in the product configurator?
Hello,We are revisiting our workflow for generating production orders based on MRP recomendations and looking at ways to automate the process. I have figured out how to automate MRP Regeneration to run on a daily schedule however I have not been able to figure out how to automatate the generatation of planned work orders for manufactured items based on the information in the Inventory Planning Display Screen. Ideally we would like to generate Planned produciton orders for all items with suggested action dates in the next 6 weeks. I started off by looking the “Create Supply Orders” button, but that just seems to take me to the Inventory Planning Display Screen, not sure if that is correct or not. Regardless I am looking for some input on how to automate this process.We are running Build 23.211.0017
We are using MRP to identify when we need to manufacture an item. MRP is adding the Quantity Remaining to Produce from a production order to the Qty On Hand. In the example below the Qty On Hand shows 50 but in the first line below it is adding 168 to that number making the total Qty On Hand 218. The 168 is what is remaining on the production order to be completed. I’ve also included a screen shot of the production order showing the 168 Remaining to produce. How can I tell MRP not to add the remainder on a production order to the qty on hand?
Hello,We recently been having this issue or every screen loading 10 secs before the next screen.Upon checking our AWS cloud we have never reached over 50% memory or cpu in the task manager.We still have 30% space left in our DB storage.Any advice on what should we do?This is how it’s like sometimes on a daily basis Our version/build:Acumatica Cloud ERP 2022 R2Build 22.212.0046 +
Is it possible to have a part default in the configuration? We have a client who uses the same door 95% of the time but needs the option to select a different door.
We have an automation schedule that prints our shipping labels every minute after the shipments have been confirmed. These prints are sent to our zebra printers and usually work without issue. Some cases the label does not print and there is no error.How can we reprint a label for a confirmed shipment? If we can identify which print job it is we can reprint it that way, but there is no way to preview the label and there are no identifiers in the print job screen to know which label is correct
Production detail includes backflushed non-stock items for outwork so that the value of outwork is included in finished goods. Detail Lines are marked for PO and POs will be created from the production order. This does not work unless the non-stock item is not flagged to require receipt. You can create a purchase order outside of the production order as normal. There is no need to receipt the PO, it will be matched to an AP invoice. How to create POs from production orders for non-stock items without PO Receipting ?
Can i add a UL label to a BOM?
hi All, we have 35 items on a sales order and we need to create a production order of 35 qty ( all in one production order). when creating a production order system only creates 1 qty production order. on the create production order pop up screen I have made sure it is 35 but still only creates 1. is there any setting we might have missed? ThanksGhazal
Hello all,We are running 2023R1 manufacturing and we are trying to Generate Orders for Sub Assemblies from assembly Inventory ID’s, but we are coming up multiple instances of this same error.AM Error: The following error occurred when the system tried to copy the BOM: Error: An error occurred during processing of the field Inventory ID value 32369-20030 IN Error: The inventory item is a template item.Highlighted is just one of multiple Inventory ID that this error could occur on. We do not have any templates in our system and none of the Inventory ID are template items. Actually Matrix Items is not enabled in our system.When we look at the BOM for say this inventory ID 32369-20030 it shows a warning that 32369-20030-1 is a template item, but again this is not a template. (see image attached)When we open the stock item screen for the assembly with the warning (32369-20030-1) add a space to the description, save the stock item the warning goes away.But this does not hold and we just mo
Customer has a legitimate reason to have production order qty exactly 1. I have tried setting Min Order Qty and Max Order Qty to 1 on the manufacturing tab, but when I create a production order from a sales order line with a quantity greater than 1, I still get that quantity in a single production order, rather than multiple production orders being created with a quantity of 1.Has anyone been successful getting MFG Max Order qty to work for this scenario? No success on 24R1 nor on 23R2.
When Creating a new item, I select Planning Method - Inventory Replenishment for planning method but then I CAN NOT enter anything in the table for Replenishment Parameters in the Inventory Planning tab. What is the cause?