Skip to main content
Solved

Scrapping an Item in a Production Order

  • Mar 29, 2022 2:56 PM UTC
  • 2 replies
  • 424 views
  • Translate All

Forum|alt.badge.img

I have a production order with 5 different OP IDs (0010 to 0050). In OP ID 0020, Part A is consumed. At OP ID 0040, it was discovered that Part A was not made correctly and it needs to be scrapped and replaced with a correct Part A. What’s the best way to go about solving this issue? 

Best answer by angierowley75

Part A is a component?  Raw material?  

You could create a material transaction for the negative quantity.  This would remove it from the production order an increase the quantity remaining.

The negative transaction would put the item back to stock - so you would want to issue it out of inventory if no longer usable.  (Inventory Issue Transaction).

You would then need to create a material transaction for a positive quantity to issue the good part to the production order operation.

 

View original

2 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • Mar 29, 2022 5:50 PM UTC

Part A is a component?  Raw material?  

You could create a material transaction for the negative quantity.  This would remove it from the production order an increase the quantity remaining.

The negative transaction would put the item back to stock - so you would want to issue it out of inventory if no longer usable.  (Inventory Issue Transaction).

You would then need to create a material transaction for a positive quantity to issue the good part to the production order operation.

 

Translate

Forum|alt.badge.img
  • Author
  • Jr Varsity II
  • Mar 29, 2022 6:32 PM UTC

@angierowley75 I hadn’t thought about a negative material transaction - that worked perfectly. Thanks!

Translate