I have one production order with two operations and 3 qty, serial track and Include scrap in completion checkbox is unchecked in production preference screen.
Now I have created one production order with 3 qty, three serial lot SRF000131, SRF000132 and SRF000133 Generated on production order released.
Now I have created first move operation for first operation, 1 qty scrapped (SRF000131) with scrap Action quarantine and qty is scrap checked, and other two qty I have moved.
Now I have created second move operation for second operation, I have moved all 3 qty but error is coming "Error: Serial Number 'SRF000131' for item 'AAMACHINE1' is already received".
I have already unchecked Include scrap in completion checkbox in production preference screen. same case for lot track is allowed to move operations.
why different behaviors for lot track and serial track...please suggest ..Thanks