Rough Cut Planning - Work Center Schedule, Production order timing

  • October 2, 2023
  • 1 reply
  • 187 views

Hi everyone,

 

Is anyone able to explain the reasoning for why after Rought Cut Planning is processed, that the system is slotting in AM0000037 in between 2 blocks of AM000002. I would expect the system to block of 2 “30 minute” blocks to complete operation ID 0010 for AM000002 entirely before starting another Production Order.

 

If i update the crew size to 2, in the WC10, it of course completes the entire operation in 1 block.

We are trying to understand what system logic, system preferences are causing the AM0000037 Production order to be slotted in-between. 

 

Best answer by angierowley75

Please log a Case with Support to investigate - I don’t believe this is expected behavior.

1 reply

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • October 2, 2023

Please log a Case with Support to investigate - I don’t believe this is expected behavior.