I am trying to see how much labor is required for producing Items but I keep running into issues with how qty to produce for each operation ID is calculated.
From what I have seen it is setting it to be always equal to the qty of the Inventory ID you are trying to make.
Shouldn’t it be equal the the quantity needed in the BOM times the qty of the inventory ID?
The materials seem to get calculated correctly and lists the total qty of the subparts under each operation ID correctly.
Anyone else run into this?
I have attached an example Production order with the first step being one that should have made a qty of 3.

