Hi Everyone,
I’m having an issue while setting up a project budget in Acumatica and would appreciate any guidance.
I tried to upload the Revenue Budget under the project, but the system did not upload all of the data from my file. In addition, one of the cost centers was uploaded incorrectly. Acumatica assigned a cost code/number that was not included in my upload file.
The issue is that this cost code is not set up in the Cost Code list. I tried to select the correct cost code from the available list, but Acumatica does not accept the change and automatically repopulates the incorrect/non-existing cost code.
I am now receiving the following error:
Error: Unhandled exception has occurred, your changes have been rolled back: Error: An error occurred during processing of the field Cost Code: Error: 'Cost Code' cannot be found in the system.
I also cannot delete the affected budget line because of this error.
Has anyone encountered a similar issue with Project Budget setup or budget uploads in Acumatica?
Specifically, I would appreciate advice on:
-
How can I correct or remove the incorrect cost code?
-
Why would Acumatica populate a cost code that was not included in my upload file?
Any suggestions or guidance would be greatly appreciated.
Thank you!