I’m looking for a way to ensure that when I convert a project quote into a project, the descriptions of the cost codes reflect the individual cost code descriptions rather than being aggregated in the revenue and cost budgets. For instance, if my cost code 15-100 is labeled as “Hardware,” I would like the project to display “Hardware” instead of the “aggregated: material”.
Is there a way to ensure the cost code descriptions are carried over from the quotes to the projects?


Thank you!
Gisele