Work Center setup

  • April 9, 2024
  • 2 replies
  • 135 views

We are currently setting up work centers and are wondering if it is possible to have all lathes or mills as one work center. The issue is that for example, the lathes do not have all the same capabilities. One machine can do 30% of the parts while the other can do 100% of the parts. We want to utilized the scheduling feature and I think this will cause issues. Is it possible to assign machines within the work center to certain parts or do we need to make each lathe its own work center? 

Best answer by angierowley75

You would need to make each lathe its own work center.

2 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • April 9, 2024

You would need to make each lathe its own work center.


  • Author
  • Freshman I
  • April 9, 2024

Ok, our consultant is telling us the opposite but I am not seeing it working nor a demo from him and we want to get working on our ~5000 BOM’s.