We overproduce on our first operation sometimes. I want to be able to overproduce at that time. However, I do not want to allow for people to be to go crazy or not have the rest of the order qty’s controls in place that make each operation qty’s match.
Example set system to overproduce
So, on operation 10 qty to produce was 100
They were able to produce 150, and they complete 150
Then on operation 20 because system is set to allow over production, even though there are only 150 to make they complete 180.
I was trying to come up with the best solution so I could overproduce but keep the integrity of the locked system in place.
Maybe some kind of buyoff and order adjustment?
Operator triggers an over production buyoff, and some corrects the order qty?
I don’t want to reinvent the wheel if something already exists.