I am used to seeing STD Unit cost details; Material, Labor, OH, Subcontract. In Acumatica I am only seeing “Unit Cost”.
The issue I am finding is that for WO, Acumatica is showing Production variance detail, which is based on Production Quantity, not standard cost. Therefore the posted variance break out is unknown as the variance is posted as one amount based on standard cost.
If I can find the Std Unit cost details, we should be able to compare STD costs vs Actual Production costs.