Hey Community, we're trying to enforce that each operation on a production order can only report up to what the previous operation actually completed. Right now Acumatica lets later operations report up to the full order quantity, even after scrap, and even defaults the downstream operation quantities to the Production Order Amount.
Example:
- Production order for 100 units, 6 operations (10–60)
- Op 10: completed 95, scrapped 5 (Scrap Action = Write-Off)
- Op 20: Acumatica lowered its Qty to Produce to 95, but still let us report 100 complete
- Ops 30–60: all accepted 100
- Order ended up Completed with 100 received into inventory, even though only 95 good units exist
See Screenshot below, when I went to do a Move Transaction for Op 20, it defaulted to 100 and let me complete it all down the operations.

Our setup:
- Acumatica version: 2025R2
- Control Point is checked on all six operations (BOM and production order)
- Order type data entry settings: Excess Qty for Operations = Do Not Allow, Excess Qty for Orders = Do Not Allow, Over Issue Material = Do Not Allow
What we expected: Op 20 would be capped at 95. At minimum, the last operation would be blocked from going over 95, since the docs say the last operation can't exceed the lowest completed qty on prior control point operations.
Questions:
- Does scrap count toward the control-point quantity? Is that why Op 60 accepted 100?
- Is there a setting we're missing that caps each operation at the prior operation's completed qty?
- If not, has anyone solved this with a customization, business event, or another workaround?
Everyone’s environments are different, but it would seem that if I have only completed a certain amount from a previous operation, I shouldn’t be able to complete more at a future operation. I did see some other posts but nothing that matched our exact