Production Subassemblies hard allocation

  • October 20, 2026
  • 2 replies
  • 14 views
  • Translate All

aslagle96
Freshman II

I’ve been searching and found where you can hard allocate Lot/Serial with Production Subassemblies, but in this case I am not using Lot/Serial numbers but I want to hard allocate the materials.

The scenario is that the generated subassemblies should only be used in the referenced parent production order.  

 

First, is there a way to do this and second is there way to make this happen automatically?

2 replies

Forum|alt.badge.img+2

​@aslagle96 Currently the system doesn’t automatically allocate completed subassembly quantities to the parent production order’s material demand. After the subassembly production order is completed and moved to stock, you need to hard allocate the quantity manually, using Line Details on the parent’s Materials tab.
There’s a community idea that covers handling non-tracked completed quantities more easily, and it’s shortlisted: Production Material Allocations. It doesn’t cover automatic allocation to the parent though, So I would recommend submitting a separate idea for that.

Translate

aslagle96
Freshman II
  • Author
  • Freshman II
  • October 20, 2026

​@PragatiMalviya64 Thanks for the quick response. 