I’ve been searching and found where you can hard allocate Lot/Serial with Production Subassemblies, but in this case I am not using Lot/Serial numbers but I want to hard allocate the materials.
The scenario is that the generated subassemblies should only be used in the referenced parent production order.
First, is there a way to do this and second is there way to make this happen automatically?