Hello, i set up an OVHD ID, “payroll” type as variable by labor cost.. factor =”1”
and my labor cost per hour is $15 in BOM.
on the testing production ticket:
2 labor trans.. one last for 1 hour labor cost =$15 ( correct) , but “payroll” ovhd = $4.5 ( expected $15)
2nd labor last for around 1 min.. and labor cost = $.25 ( correct) , but “payroll” ovhd cost =$.08(expected $.25)
can someone shed some light please?
thank you
Zoey