Adding an operation to an existing production order.  This is the only operation for the production order.  The following image is from the Production order details screen.

The following image is from the Companies screen.

 

Best answer by PragatiMalviya64

@ltussing03 Can you please provide little more details? 
like what standard cost is used for the work center, what’s qty to produce and what was the planned cost for the operation before you were adding the operation, trace for the error and steps to reproduce this issue. I tried but was not able to reproduce this error. 
I think it's better to submit a support case because this issue will require lot of other details to be looked at. 

2 replies

Forum|alt.badge.img+2

@ltussing03 Can you please provide little more details? 
like what standard cost is used for the work center, what’s qty to produce and what was the planned cost for the operation before you were adding the operation, trace for the error and steps to reproduce this issue. I tried but was not able to reproduce this error. 
I think it's better to submit a support case because this issue will require lot of other details to be looked at. 


Forum|alt.badge.img+5
  • Author
  • Captain II
  • July 16, 2024

Pragati thanks for the reply!