Partial SO Line Shipment from Work Order Allocation

  • Mar 25, 2026 6:59 PM UTC
  • 4 replies
  • 83 views
  • Translate All

We are having an issue attempting to partially ship an SO line linked to a partially completed production order.  Work order/SO quantity is 100, we have 50 complete.  Selecting the SO line shows 50 on hand/ available / available for shipping, but none allocated.  Line details shows the below, which looks strange from what I recall in the past.  This hasn’t been an issue in the past but we recently upgraded to 25.201.0213.2 and this isn’t something we do often so wondering if it is a bug or some obscure setting that now needs to be changed.  Any guidance would be appreciated.

 

 

Thanks,

Dan

4 replies

jhalling52
Jr Varsity I
Forum|alt.badge.img+1
  • Jr Varsity I
  • Mar 25, 2026 7:42 PM UTC

What’s the Shipping Rule on the SO Detail Line?  If it is Ship Complete, try changing to Back Order Allowed and then see if the shipment can process.

Translate

  • Author
  • Freshman I
  • Mar 25, 2026 7:52 PM UTC

The shipping rule is Back Order Allowed. 

Translate

Forum|alt.badge.img+11
  • Captain II
  • Mar 27, 2026 10:49 AM UTC

​@dgohmann 

 

the key in this situation is the Qty Received field:

That is what tells you how many are ‘Allocated’

 

Was the second allocation line added manually? 

Also, what exactly is your issue, I couldn’t quite understand whether it was not being able to add the item to a shipment/create a shipment or something else.

Translate

Chris Hackett
Community Manager
Forum|alt.badge.img
  • Acumatica Community Manager
  • Jul 21, 2026 10:26 PM UTC

Hi ​@dgohmann were you able to find a solution? Thank you!