Skip to main content
Question

Multi level Cost Roll not Rolling Cost from Sub Assemblies/Bulk to Finished Goods ( Following Standard Cost)

  • Sep 11, 2024 5:51 PM UTC
  • 6 replies
  • 182 views
  • Translate All

Forum|alt.badge.img

I did Multi Level Cost roll for Sub assembly Item and then on the finished goods , however it shows VOH and VL on Subassembly item not on Finished goods   , Kindly advise

6 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Sep 12, 2024 10:28 AM UTC

Can you add more detail? perhaps screen shots?  are you expecting the cost of the subassembly to be broken out on the finished good?  

Translate

Forum|alt.badge.img
  • Author
  • Varsity II
  • Sep 12, 2024 11:59 AM UTC

 

ID59018 is FG with 11031 is subassembly part has a cost … this cost need to be rolled up to the 59018 FG /BOM  total Cost .  However this is showing when we run Multi level BOM Cost 

 

Translate

Forum|alt.badge.img+3

@jvarughese23, 

The multi level BOM report will show you how the totals are calculated and break out the cost components on the report.

 

The subassembly costs on cost roll are factored into the material cost for the finished good. When a production order is created the subassembly costs are included as material costs. The cost roll most closely resembles what the production cost will look like.

Translate

Forum|alt.badge.img
  • Author
  • Varsity II
  • Sep 18, 2024 5:04 PM UTC

@andrestamour43 .. I tried to create a GI  in TST Revision Two  Product DB and after doing the MultiCost roll it shows VOH and VL on Finished Goods  which has Sub assembly Items used BOM1 and BOM 4 .   

 

Translate

Chris Hackett
Community Manager
Forum|alt.badge.img
  • Acumatica Community Manager
  • Nov 13, 2024 12:30 AM UTC

Hi @jvarughese23 were you able to find a solution? Thank you!

Translate

Forum|alt.badge.img
  • Author
  • Varsity II
  • Nov 13, 2024 9:31 PM UTC

@Chris Hackett No Solutions yet

Translate