Skip to main content
Solved

MRP Basic Setup

  • Jul 22, 2021 6:01 PM UTC
  • 3 replies
  • 633 views
  • Translate All

I am attempting to create a flow of basic steps for enabling the MRP feature. Please let me know if I am missing anything in particular, or confirm that the basic steps are included below. Thank you!

 

MRP Configuration Prerequisites

  1. Numbering Sequences: CS201010
  2. Production Order Types: AM201100
  3. Work Calendar:  CS209000
  4. Replenishment Classes: IN208800
  5. Warehouses: IN204000
    1. Review Manufacturing and Location Table tabs
  6. Stock Items:  IN202500:
    1. Review Replenishment Info

 

Configuration Steps:

 

  1. Creating an MPS Type: AM203000
  2. General MRP Settings: AM100000
  3. MRP Buckets: AM201200

 

Step required to view data: Regenerate MRP

Best answer by angierowley75

There is an Implementation Checklist topic for MRP in the Acumatica on-line help file.  I would recommend you cross check your list with the help.

 

View original

3 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • Jul 22, 2021 6:50 PM UTC

There is an Implementation Checklist topic for MRP in the Acumatica on-line help file.  I would recommend you cross check your list with the help.

 

Translate

  • Author
  • Freshman I
  • Jul 22, 2021 8:55 PM UTC

Great! Thank you!

Translate

jdobish
Captain II
Forum|alt.badge.img+2
  • Captain II
  • Dec 22, 2021 12:48 AM UTC

It would be nice if this actually included all of the details. The help is missing a lot of information. 

Translate