MFG Move Transaction - default Operation to be the last operation

  • January 9, 2025
  • 3 replies
  • 111 views

Forum|alt.badge.img+1

Hi, client has a BOM with multiple operations.  During the Move transactions, is there a way to have the last Operation be the default?   There is a feature for Control Point, but it seems to force this to be a data collection; however it is not defaulting the last operation?  We do not want data collection for each operation.

Best answer by phillipmarotta

Note, some of the extra sequences of the production order are being generated by the Phantoms.  So, there is a BOM component Phantom setting to Exclude operations and it is working as expected.  This will help eliminate the issue above. 

 

3 replies

Forum|alt.badge.img+2

@phillipmarotta We currently don't have that capability to set the default operation id in the Move form. Control point mandate the reporting on the operation, it's not used for defaulting purpose.
I would suggest creating customization to default the Operation ID on Move form to be the last operation. 


Forum|alt.badge.img+1
  • Author
  • Freshman II
  • Answer
  • January 10, 2025

Note, some of the extra sequences of the production order are being generated by the Phantoms.  So, there is a BOM component Phantom setting to Exclude operations and it is working as expected.  This will help eliminate the issue above. 

 


Forum|alt.badge.img
  • Varsity III
  • February 19, 2025

@PragatiMalviya64 How would I go about doing a customization for this? I noticed that the dac for PXdefault had the operation ascending, so i tried changing it to descending, but that didnt work. Could you point me to where i should look to have the last operation be the default instead of the first?