Question

Issue a different material other than the material specified in the BOM

  • 10 August 2022
  • 1 reply
  • 89 views

Hi All,

Is there a way to issue a material to a production order other than a material that has been specified in the BOM?

Thank you!

1 reply

Userlevel 5
Badge

You should be able to manually issue selected materials to a production order using the Materials screen.

 

If you are not able to, try checking under Production Order Types to see if ‘Issue Material not on Order’ is allowed. 

Reply