How to update costs on an estimate with current material costs

  • 26 October 2022
  • 2 replies
  • 49 views

Userlevel 6
Badge +5

Hello,

We have a quote with material on the operations.  We want to update all of the material costs used on the quote with the current material’s costs.  There does not seem to be a button or anything that says “update costs” or “refresh costs”.  It seems the only option is to manually research the current costs and manually enter them, or delete the material and re-add it to the quote.

 

Am I missing something?  (Probably a big red button in the middle of the screen I am not seeing!)

 

icon

Best answer by angierowley75 26 October 2022, 23:01

View original

2 replies

Userlevel 7
Badge +3

The two options you provided are the only ones of which I am aware.  Providing an Update Cost action would be a great enhancement Idea, however!

Userlevel 6
Badge +5

Thanks Angie!

I thought I was missing something.

Reply


About Acumatica ERP system
Acumatica Cloud ERP provides the best business management solution for transforming your company to thrive in the new digital economy. Built on a future-proof platform with open architecture for rapid integrations, scalability, and ease of use, Acumatica delivers unparalleled value to small and midmarket organizations. Connected Business. Delivered.