How to update costs on an estimate with current material costs

  • October 26, 2022
  • 2 replies
  • 94 views

Forum|alt.badge.img+5

Hello,

We have a quote with material on the operations.  We want to update all of the material costs used on the quote with the current material’s costs.  There does not seem to be a button or anything that says “update costs” or “refresh costs”.  It seems the only option is to manually research the current costs and manually enter them, or delete the material and re-add it to the quote.

 

Am I missing something?  (Probably a big red button in the middle of the screen I am not seeing!)

 

Best answer by angierowley75

The two options you provided are the only ones of which I am aware.  Providing an Update Cost action would be a great enhancement Idea, however!

2 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • October 26, 2022

The two options you provided are the only ones of which I am aware.  Providing an Update Cost action would be a great enhancement Idea, however!


Forum|alt.badge.img+5
  • Author
  • Captain II
  • October 26, 2022

Thanks Angie!

I thought I was missing something.