HOW TO UPDATE BOM COST AS RM LAST COST UPDATED

  • December 1, 2021
  • 2 replies
  • 356 views

Forum|alt.badge.img

say bomA using RM A in op10, last cost for A is 6.00

10 days later, new po cost for A is 7.00.

how can i update bomA to reflect RM A to 7?

thank you

Zoey

Best answer by angierowley75

In the Bill of Material Workspace there is a Cost Roll (AM508000) Process that will perform this function.  Read through the on-line help file of this screen for guidance.  I will try to answer more specific questions if you have them.

2 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • December 1, 2021

In the Bill of Material Workspace there is a Cost Roll (AM508000) Process that will perform this function.  Read through the on-line help file of this screen for guidance.  I will try to answer more specific questions if you have them.


Forum|alt.badge.img
  • Author
  • Jr Varsity II
  • December 1, 2021

thank you! problem solved. 