I am trying to enter a Disassembly for a Production Order. I entered the original Production Order number in the References tab, but Materials in the Disassembly order are using their current cost.
The reason we are doing the Disassembly order is to correct the inaccurate Materials cost from the original Production Order. How can we get the original Production Order “reversed” using the original costs?