Skip to main content
Solved

Disassembly Costing Question

  • 19 July 2024
  • 3 replies
  • 49 views

Good Day Everyone,

 

I am trying to figure out how costs get calculated on disassemblies. The knowledge base associates disassemblies with the Actual cost method. Is there a formula I can see on how this get calculated?

Does anyone have a formula?


Thanks

3 replies

Badge

https://help.acumatica.com/(W(67))/Help?ScreenId=ShowWiki&pageid=4fdb445b-8aa0-461f-9039-85fad92d68c3

 

This link might help answer your question

Userlevel 5
Badge +1

@podonnell1 https://help.acumatica.com/(W(67))/wiki/show.aspx?pageid=3f3a272b-cc4e-4418-bcba-472b6f039df1&HideScript=On

 

 

Hello Everyone… I probably stated the question improperly. What I found was that the valuation method on the stock item set the cost of the disassembled item. All my items are set for FIFO, thus the system was using FIFO to value/cost the disassembled item. What I did to find this out was check the cost of the lot on the line details tab on the disassembly screen...this is where the system was taking the cost from.

 

 

Reply