Can MRP use Linked Production Orders for Supply

  • February 12, 2024
  • 2 replies
  • 94 views

Forum|alt.badge.img

We have a client using configurator for make to order items. Production Orders are linked to Sales Order lines. But when MRP runs, it doesn’t seem to recognize these links. MRP is allocating any current as yet unshipped and differently configured inventory to satisfy the next-to-ship sales orders, even though those orders are linked to existing open production orders.

Does anyone have ideas on how to get MRP to use the linked production orders instead?

Best answer by dsimone20

Just found this Idea to address this situation:

 

2 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • February 12, 2024

MRP looks at all demand and all supply and does not consider order pegging.  I don’t know of a way in standard product to force MRP to observe the relationship.


Forum|alt.badge.img
  • Author
  • Varsity I
  • Answer
  • February 12, 2024

Just found this Idea to address this situation: