We have a client that has multiple production lines that they can choose from to perform the same operation. I am trying to use APS to automatically fill the capacity of these lines. 

As of yet I have not found a suitable solution to achieve this. 

Does anybody have some advice here? 

 

There is work center substitution capability within Acumatic MFG APS.

https://help.acumatica.com/(W(43))/Help?ScreenId=ShowWiki&pageid=c0b2f338-88f0-4ab0-8b4b-222526a5bf25

 

However the APS algorithm currently does not support scheduling multiple assembly lines / splitting capacity for production across a group of work centers.  We rely on Vendor Solutions to provide this advance scheduling capability.


Hi @angierowley75, thank you for your reply. I will investigate the solutions available.