When I do a BOM cost rollup, it is pulling the cost of the old revision and putting that cost into the pending cost instead of the latest revision.
For example:
One part may have 4 revisions based on changes we have made to a part (REV A was the original BOM and then we created REV 1, 2, 3, 4 based on the customers needs). Instead of pulling REV 4 which is the current rev, it is pulling REV A’s cost and putting that into the pending cost field instead of REV 4.