If you have Advanced Planning and Scheduling enabled, does the Fixed Manufacturing Leadtime do anything to Action Dates on planned supply in the Inventory Planning Display? Help seems to indicate that it is not considered, and that is what I am seeing, just checking to make certain this is the case.

Best answer by angierowley75

Actually, I think the MRP Whitepaper explains this (not the APS whitepaper):
 

 

3 replies

Debbie Baldwin
Acumatica Moderator
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • July 18, 2025

@DarrylW64  - Have you seen the Production Scheduling Whitepaper? 

 


angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Answer
  • July 21, 2025

Actually, I think the MRP Whitepaper explains this (not the APS whitepaper):
 

 


Forum|alt.badge.img
  • Author
  • Freshman I
  • August 1, 2025

Thank You ​@angierowley75. I realized as I dug deeper that the use fixed mfg leadtime is actually used in two places. Inventory Planning Preferences and Production Preferences. The first applies to planned orders and the second to production orders.