We recently implemented V2025 R2 and use a 3rd party MES for production order scheduling and data collection.   Labor transactions are reviewed and approved in the MES before pushing to Acumatica and being released.  As such, Labor collection in not real time.   Therefore Move transaction can Complete the production order prior to having all of the cost applied resulting in Finished Goods being undervalued.  Reopening the Production Order to process the Labor transactions and re-completing creates a WIP Variance transaction, but the valuation of the Finished Good remains undervalued as well as COGS once sold.

I assume we are not the only Acumatica manufacturer that doesn’t do real time data collection and processing.   What procedures or configuration need to be put in place to get our Finished Goods and COGS accurate?  Stated differently, how do we process the WIP Variance transactions to keep Finished Goods and COGS acurate.

NOTE:  We currently review and process Labor transaction in the MES on a weekly basis in line with our payroll processing procedures.  So a Production Order that is released on Monday and completed on Friday would carry $0 of labor from WIP to Finished Goods.

5 replies

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Nov 24, 2026 6:21 PM UTC

Is there a reason you are not backflushing labor?

Translate

Forum|alt.badge.img
  • Author
  • Freshman I
  • Nov 24, 2026 7:28 PM UTC

​@angierowley75  From the Help…

 

Backflushing is not appropriate if any of the following conditions are met:

  1. The amount of labor recorded for operations may vary from one production run to another. This amount may represent a significant cost of the product.
  2. Your organization tracks employees for the product being produced.
  3. You use lot- or serial-tracked materials in production. Although the system can automatically issue lot- or serial-tracked items during backflushing, in this case, backflushing is generally not recommended.
  4. Material consumption is variable, or significant waste of materials may occur.
  5. Material substitutions are common and allowed during the production process.
  6. Labor transactions for each employee need to be reconciled with time and attendance for payroll purposes, or a shop data collection system is used.

Regarding Labor backflushing, items 1, 3 and, to a lesser extent, 6 apply to our environment. 

Translate

Forum|alt.badge.img
  • Author
  • Freshman I
  • Nov 24, 2026 8:40 PM UTC

​@angierowley75   I did some research on Backflushing.   Sounds like setting the Workcenters with a default to backflush labor may be our best option. Some questions:

  1. Am I correct that WIP/Finished Goods cost will be be based on whatever labor value was on the operation steps of the production order detail, and WIP Variance will reflect the applied cost of the Labor transactions?  If so, we would need to establish variance management procedures to monitor accuracy of our BOM’s.
  2. If I enable Labor Backflushing on the workcenter, will that apply to currently released production order operations, or will they need to be updated?
Translate

angierowley75
Acumatica Moderator
Forum|alt.badge.img+3
  • Acumatica Moderator
  • Nov 25, 2026 6:36 PM UTC

#1 Usually companies that leverage backflush would not see a variance for labor - as your planned labor hours would be identical to your actual labor hours.  Where do you think you would have a variance?

#2 Yes, any Production Order already created would need to have Backflush Labor set manually, 

Translate

Steve Milner
Varsity III
Forum|alt.badge.img+8
  • Varsity III
  • Nov 25, 2026 6:55 PM UTC

My replies are created in part with the help of proprietary AI, built with my AI skills, curated and maintained myself. Most replies are tested on local instances before they go up, and all are reviewed before posted.

@ehuels, before you change the work centers, check the Costing Method on your production order type (Production Order Types, AM201100). It decides what the last move puts into Finished Goods. On Actual, the completion takes the WIP balance as it stands at that moment, so labor posted afterward never reaches FG. That's what you're seeing. On Estimated, the completion takes the actual cost posted so far plus the planned cost of anything not reported yet. An operation with no labor posted goes to FG at its planned hours times the work center's rate. Labor that posts later stays in WIP, and closing the order writes the leftover balance to the WIP Variance account. Each new order takes the method from its order type.

That gives you the variance setup from your first question without backflushing.

On backflush itself, you're right about the first half. Backflushed labor is the order operation's setup time once, plus run time for the quantity moved, priced at the work center's standard cost. The catch is the MES. Labor entry doesn't block a backflush operation, so if the MES keeps sending labor for those operations, the order gets charged for that labor twice.

For your second question, released orders don't change. The work center's Backflush Labor box defaults onto new BOM operations, and Mass Update on its Where Used tab updates existing ones. Each production order copies the box from the BOM operation when it's created. An open order keeps its value unless you put it on hold and change the operation on Production Order Details (AM209000).

 