System design (I use 2024R2 and will be using 2025R2 soon):
- Prepare statement process should be triggered for each cycle, and must be completed successfully before going to next steps.
- Print statements process depends on the prepare process, and can’t be triggered unless the preparation is completed successfully.
Current state:
- I use automatic schedules to run the process overnight because it lengthy process.
- We run Prepare Statements schedule first, then check the next day whether it is successfully completed and that the statement cycles are available in the “Print Statements” screen.
- Based in the previous successful schedule, we trigger other schedules to email the statements
The question/Desired situation:
Is it possible to configure the schedules to run in sequence based on the successful status of the predecessor schedule? i.e. I want the system to use schedule to run the prepare statements, and if this schedule is successfully run, then run the email statements schedule.