side panel for change orders at project level

  • Dec 13, 2024 7:26 PM UTC
  • 1 reply
  • 73 views
  • Translate All

iqraharrison
Captain II
Forum|alt.badge.img+9

hi! is there a side panel we can set up on the project level for change orders? I know there’s a tab for it but wanted to see if that would be added as a side panel as well? i was able to add it to the project inquiry screen but it didn’t show up at the project level.  would this be a customization?

Best answer by mike.gillum

Hi ​@iqraharrison ,

Interesting question. I think it would need to be a customization but I could be wrong about that. I would pose this on the developer forum. I can see the need for this if you want to analyze the change request while perusing the cost or rev budget at the same time. Change Orders side panel would be beneficial as well. Maybe this should be posed as an Idea for Construction Edition to add as a feature….

Best,

Mike

 

View original

1 reply

mike.gillum
Acumatica Moderator
Forum|alt.badge.img+2
  • Acumatica Moderator
  • Answer
  • Dec 13, 2024 8:12 PM UTC

Hi ​@iqraharrison ,

Interesting question. I think it would need to be a customization but I could be wrong about that. I would pose this on the developer forum. I can see the need for this if you want to analyze the change request while perusing the cost or rev budget at the same time. Change Orders side panel would be beneficial as well. Maybe this should be posed as an Idea for Construction Edition to add as a feature….

Best,

Mike

 