Skip to main content
Solved

Equipment Time Card - Does not allow enter project

  • May 19, 2022
  • 2 replies
  • 177 views

Forum|alt.badge.img

Hi,

In the Equipment time card, I’m not allowed to enter the project. How can I enter Project, Task and The cost code in the equipment time card form.

Thanks,

Dulanjana

 

Best answer by Kandy Beatty

Hi @dsenevirathne54 

Is this possibly a permission issue? Do you have the Edit right to this screen? I tested it on my local version and was able to add those you mentioned. 

 

2 replies

Kandy Beatty
Captain II
Forum|alt.badge.img+17
  • Captain II
  • Answer
  • May 19, 2022

Hi @dsenevirathne54 

Is this possibly a permission issue? Do you have the Edit right to this screen? I tested it on my local version and was able to add those you mentioned. 

 


Forum|alt.badge.img

Hi @kbeatty21 ,

Yes, I check and it works in my local instance too. But I checked access rights and all. But still does not work.  I will get support by a support ticket. 

Thank you for your support.

 

Thank you,

Dulanjana