Does Acumatica have another way to assign Projects to Work Groups at the Project Level other than Approval Maps. I would have assumed a Work Group or PM (assigned at the project level) could follow an AP Approval WorkFlow without users have to go into Approval Maps. Is there another way to assure WorkGroup AP Bill Approval routing can be achieved.
Best answer by Laura02
View original