Skip to main content

Use up and replace stock item on BOM for manufacturing

  • November 19, 2021
  • 1 reply
  • 223 views

When a stock item is redesigned and the original item is still usable, I need a feature to use up and replace the original item. In SAP this is called discontinuation data. In Acumatica, I have no process or control over using up and replacing items.

 

Follow-Up Material: Number of the material that the system uses in materials planning to replace the material to be discontinued once its warehouse stock is depleted. In the material master record and also in the bill of material (BOM), you can define a follow-up material for a material to be discontinued. The follow-up material defined in the BOM has a higher priority than that in the material master record.

 

https://blogs.sap.com/2014/03/12/concept-of-discontinuation-data-material-master-and-bom/

1 reply

  • Author
  • Freshman I
  • November 19, 2021

I submitted this similar idea a year ago, please provide an update on the status of this feature.