We have a production order with an operation for service. The operation contains a non-stock item for the service.
When I click “create purchase order” I get this error.
Here is the non-stock service on the operation
We have a production order with an operation for service. The operation contains a non-stock item for the service.
When I click “create purchase order” I get this error.
Here is the non-stock service on the operation
It has a vendor assigned.
Debbie,
I think we may have it. Thanks.
I will restart this and let you know.
I’m sorry.
Feeling really needy here.
Confirming vendor shipment fails.
Please wait. Need to check something else.
Debbie,
Based on your image and one I grabbed from a video, I need 2 material lines. One that is “Ship To Vendor” and one that is “purchase” for a subcontract source.
I have been playing with this as time allowed all day.
ID KLB0011 is the material that was issued to this production order.
Material “Service” is the non-stock service item.
I am able to purchase the service. I can then do the vendor shipment. But it isn’t correct.
The outside process tab doesn’t show that it’s been sent out for service. When I created the vendor shipment it had suggested 2 lines. One was for the finished product that the production order is making which makes no sense. (I manually deleted that line from the vendor shipment)
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.