Does anyone have an import template for multi level BOMs. I have BOMs that have multiple levels and include Outside processing. 2020 R2.
BOM import with multi level - Template needed
Best answer by kristianharianja
Hi Evan,
You just need to bring those BOMs into spreadsheet template provided in Acumatica instance. You don’t need to specify their level because an assembly could be at any level depending on what parent items you manufacture. If an assembly has multiple active revisions you can specify the BOM ID and its revision ID in the Material line of its parent BOM to pick up the correct BOM when creating production order.
With regard to outside processing you could add a non-stock into the BOM and select type Subcontract in the Material Type and and source Purchase. This setup will separate cost bucket for the outside processing. Later in the process you can link the PO to production order.
With BOM, you can run Cost Roll to calculate the cost to manufacturing item that include/roll up the cost of subassembly. You can then use this as standard cost for your item.
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.