Hi,
Is there any option to define a scrap factor for a finished good item or subassembly. This factor should be considered in MRP in deciding the material requirement.
Thanks,
Nadeeka
Hi,
Is there any option to define a scrap factor for a finished good item or subassembly. This factor should be considered in MRP in deciding the material requirement.
Thanks,
Nadeeka
Is the scrap 1kg of Component 1 and 1kg of component 2 in the example above?
So if I want to make 20kg of X I would need 11kg of comp 1 and 11kg of comp 2?
If I am understanding correctly then I would recommend exploring the scrap factor for materials on the BOM Material grid.
Hi
Thank you for the explanation. I am looking to add a wastage percentage to the Finished good item without adding the factor to the components. I need to setup a fixed wastage to FG which also considers in MRP (Is there any option to set the rate it in the stock item form or any other form)
Thanks,
Nadeeka
Hi
Hi
No. I didn’t able to find a solution
Thanks,
Nadeeka