Question

MRP vs Critical Material - what do other manufacturers find most useful?


Userlevel 1

We are a manufacturing facility and are looking for input from other manufacturers on what you find works best for you, as far as being able to tell what materials we need to fulfill orders, whether it be PO’s to order Raw Material or Work Orders to build inventory in-house.

We have tried Critical Materials and MRP. Critical Materials doesn’t seem to look at the whole picture, when we enter a WO #, the system seems to only see if you have enough materials to build that one WO.  When we look at MRP, we see a whole other story of what items need to be ordered or built.

Keep in mind, we also need to be able to link Parent Item WO’s with Children Item WO’s.

I look forward to seeing what my fellow community members have to say about this.


5 replies

Wondering if you use the Materials Requirements by Item Inquiry on the MRP workspace?  The limitation of this inquiry is that you have to look item by item.

 

Userlevel 1

@TShoaff we are not using the Material Requirements by Item Inquiry on the MRP workspace.

We are using MRP because it givesus a better picture of our demand, compared to Critical Materials.

 

As you mentioned, the biggest difference will be whether you are looking at the specific work order, or the purchasing as whole. This case is really useful when you have a particular item you are worried about, and you want to make sure that you can accomplish building this.  In my experience, this should be the exception, and MRP should be the rule. 

MRP is a different animal, but if you take a look, you will notice that these critical materials show on the MRP report.  There is a lot that goes into these MRP calculations, including min qty, max qty, lot qtys, forecasts, etc. MRP should be utilized when you are looking forward, and are ahead of the game. This is always a challenge in a manufacturing environment, but MRP will help you get a better view based upon the required dates.

As of right now, if you use the Material Requirements by Item Inquiry, it will give you what you are looking for, but it its a bit clunky in my opinion. I have seen a few people that will utilize the MRP display, and then will export to excel, and create a sum by item to get a consolidated total for purchasing. 

It would be nice if you could get a consolidated list directly out of Acumatica.

Userlevel 1
Badge

Hi, most of our customers use MRP and I never see them use Critical Material for daily planning. MRP tries to balance quantity between demand such as SO, production order, forecast, etc vs supply from purchase order, production order, on hand, other warehouse. It gives you big pictures. Through Exception, it helps you to evaluate your supply side (before making another supply via MRP Display) whether purchase order and production orders are late, not required, needs to be expedited, etc.

However when you generate child production order via MRP, there is no link established because MRP. At this stage, MRP seems to be designed to only look at quantity for planning (demand vs supply) not establishing link between parent and children. I assume when you need link you plan to allocate the finished item in the children order to its parent, cannot be used in other order. Also it looks like it’s a make to order type of item, not standard item you can simply take from stock. If this is the case you can mark the child items as marked for production and generate production order for them from parent order not via MRP.

Though I still would like Acumatica establish link when order is generated from MRP. 

Userlevel 1
Badge

Most of our clients will use MRP since it aggregates demand and takes lead times into consideration when planning replenishment.

The value of the critical materials inquiry in a make to order or make to stock environment is tracking those items that have short lead times and also to verify any replenishments that may have been planned via MRP have been received so as not to delay production.  

In a job shop environment, the critical material inquiry allows purchasing or manufacturing of components to be tied to the specific production order.

Reply


About Acumatica ERP system
Acumatica Cloud ERP provides the best business management solution for transforming your company to thrive in the new digital economy. Built on a future-proof platform with open architecture for rapid integrations, scalability, and ease of use, Acumatica delivers unparalleled value to small and midmarket organizations. Connected Business. Delivered.