Hi all
We have a scenario where we have e.g. a PO for 1000 of Item A. As soon as we link 10 of that item on a Production Order to that PO, the remaining qty on the PO (Qty:990) is no longer visible for a SO to link to it. It also doesn’t appear in the Replenishment routine. Our replen says to order in 1000 to top back up to max even though we have 990 free on order.
This is causing us all sorts of problems with over ordering or splitting lines on the PO. Has anyone overcome this? It is something that Acumatica know about but are not planning to change from the communication I’ve had with them.
I’d welcome any other suggestions on how we can handle Production Order and a SO needing to link to the same bulk PO.
Thanks for reading.