We are in the middle of implementation and I am writing a workflow for issuing Purchase Orders to Outside Process vendors for metal finishing (Ie: Powdercoating, Plating, etc), however I am not certain that I am totally clear on the correct process.
We have setup non-stock items to represent the outside processes. These have been defined as a service, They have vendor(s) associated with them on the vendors tab and the default price as been set to $1.00.
On the manufactured (stock) item I have defined a BOM and on the operation step for the outside service I have added the Non-Stock item (Powdercoat) to the BOM as a material. The qty required has been set to the per-piece cost that I was quoted, the Unit cost remains at $1.00, The material type has been set to “Sub Contract” and the Subcontract Source has been set to “Purchase”. On the Outside processes tab I have also checked the “Outside Process” box and have selected the preferred vendor for this operation.
I have then opened a production order for this manufactured (Stock) item and use the Create Purchase Orders Action fromt he , the system is not recognizing/honoring the vendor that is specfied in the production order menu, however when the Create PO form opens, the system is not honoring the vendor that was previously defined on “Outsource Tab” of the BOM. It appears the system is only looking at the “default” vendor defined on the Non-Stock item, or it is leaving the field blank if the Non-Stock item does not have a vendor designated as default.
This leaves me a with few questions:
- What is the purpose of defining the preferred vendor on the outside process tab of the BOM if the system doesn’t honor it.
- Is my workflow for issuing PO’s for outside processes correct? Is there a document that fully defines this process? I have found documents that address parts of this process, but I am not certain that I have found something that covers the process start to finish…
Any help on this matter would be appricated.