We use average costing and also Phantom Exclude materials. Sometimes those Phantom Excluded Materials have run time included in their BOMs.
- When creating a production order, the cost roll ignores the routing of the Phantom Excluded material and only blows the parts into the parent BOM. This behavior is correct.
- When performing a multi-level cost roll, the cost roll includes the cost associated with the run time of the Phantom Excluded material. We believe this behavior to be incorrect - the BOM Cost Roll should ignore the cost of the run time when rolling up costs into the parent assembly
I’d like others’ thoughts on this. Maybe our perspective is incorrect.