i have a client who is using task, item and cost code on their cost budget. everything has it’s own description (task is filled out on the task tab of the project) however, when i add the cost code to the cost budget, the description inputs the cost code description, not the task description or the item description. i was wondering if there was a way to change what description defaulted to that (ideally, i would like the inventory description to populate in the field):