Hi All,
Business case: we have 1 container of chemicals. we will send it to the manufacturer to convert it into 3 bottles. The cost of bottles will include the cost of container chemicals divided into 3 plus the manufacturer's fee.
Currently, I set up 1 Stock item (Finished Good) as a Kit and it’s included 3 components. I use the function Kit Disassembly to convert from 1 container to 3 bottles and add the cost of the manufacturer's fee. However, the original cost of material is not going to be the cost of the component as expected.
Do you know any other flows that are more effective & meet the expectation?
Our expectation is the cost of each bottle will be included the cost of container chemicals and the manufacturer's fee.
Thanks in advance,
Yên Chi