Hello,we plan to cover the proces, that we can take data from SO line automatically into linked Product Configuration!Did someone work on this process? Does someone know if this is an standard process in Acumatica?(Optional: take data direct vie REST- API into Product Configuration→ Is this posible? Any experience?:-)) Thanks a lot in advance! BRTim
I want to schedule the day and hour in Planning Board of Mnaufacturing Order manually! This is posible. But here comes the problem:Each time after saving the new scheduled date the System is reset the date and time on original values? (System is not keeping the manually changed dates!)I am using Acumatica 2021R2 (21.209.0034) Does anybody have some idea what could be wrong? Thanks a lot!
Is there a posibility to stop aut. labor/ tools/ Overhead costs bookings coming from manufacturing transactions? Maybe a flag/ setting in manufacturing preverences to control this?
Hello, tried many different things to get the Tool Schedule (AM000014) running! Unfortunatelly without any success. Always getting a empty screen. Does someone knows any tip or trick to get some results in that screen? Pretty sure to have all neccessary setup done. Thanks a lot. BR
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.