Hi All, Hope you are doing well.How can I find out the Screen ID or Screen Name based on the DAC name? Thanks,Moulali Shaik.
In 2021R1, I am trying to change “Start Date” to “Creation Date” on the Tasks Screen CR306020I’ve gone through the answers on this topic: None of them are working.If you inspect that field it shows this:I’ve tried doing it in VS for both StartDate and StartDate_Date. In debug, the StartDate fires so I know I am hitting this code. I tried StartDate_Date, but that does not fire.The actual code for the one that fires is:[PXMergeAttributes(Method = MergeMethod.Append)][PXCustomizeBaseAttribute(typeof(PXUIFieldAttribute), nameof(PXUIFieldAttribute.DisplayName), "Creation Date")]protected virtual void CRActivity_StartDate_CacheAttached(PXCache cache){ string joe = "joe";}I also tried editing the field in the Project Editor:Neither of these change the Display Name.I suspect it may have something to do with the fact that the field name shows as StartDate_Date?StartDate_Date is not a field you can select in the editor.I am able to make the other three fields required both in the Project Edito
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.