Does anybody know how to update an existing time activity using business event/import scenario? I am trying to update time activities with the correct project task and cost code combination when techs enter time incorrectly. It’s like an “auto-correct” feature…. The GI I have brings in the incorrect time entries, the business event triggers on record insertion, and the import scenario is supposed to replace the project task and cost code with the correct coding. The two challenges I see are:Perhaps I need to place the activity on “hold” first so the project task and cost code are editable fields. You can see in the import scenario that I tried placing on hold, saving, then editing the fields and saving again. How do I link the records in the GI with the proper time activity? I’m trying to do this using the RefNoteID. It seems as if that’s the only way to link them so the correct entry is updated through the import scenario. The XML of the GI and import scenario are both attached. I a
Hi all,I'm trying to include an uploaded jpeg image of a stored item to be invoiced on the standard AR641000 form. I've carefully followed an example in the Acumatica S150 Reports Designer document - (See attached Training Doc1 & Doc 2, pages 30-34.). I have checked and rechecked, but continue to get the following error. (See Trace 1 attached).The problem seems to be with the table / table join of the Inventory Item. (See attached schema build.Any assistance would be very much appreciated.Thanks
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.