This is a follow-up to an earlier question- where Denise indicated that there is (or will be?) a secondary setting for “x” projects to be posting to the GL. Where is this setting to be found and configured?
We have entered timecards and posted to projects with the GL Posting turned on. Time to projects got posted in a GL batch, however time to the <x> project (which included the Holiday time and normalize time) did not get dollarized into a GL Batch. This is on 2021 R1 with no Payroll enabled.