Scenario:
Configuration ID has Features and Options within the Features. The Options have subassembly Inventory IDs with BOMs. These BOMs have Operation Work Centers. Each of these Work Centers has a material list of items that need to go to that Work Center. The Work Centers in this BOM match the Work Centers in the Configuration ID BOM ID. These materials, for the most part, are all stocked, finished goods.
The materials within these Work Centers, should be rolled up/added to the Work Centers of the Configuration ID BOM ID.
When using Phantom routing “Exclude” it ignores the operation Work Centers of the subassembly BOM and adds the material to the Operation ID of the Feature Option. This, adds the materials to the WRONG Work Center.
When using Phantom routing “After” it adds the operation Work Centers of the subassembly BOM and adds DUPLICATE Work Centers for each Work Center of each Option BOM selected. I assume that “Before” will do the same, but add the Operation Work Center, as a duplicate, before the Operation ID of the Option.
Does anyone know, if there is a settings or a way, to have the materials of the Option BOM be rolled up into the same Work Center as the Configuration ID BOM ID?
This is really frustrating. If there is not a way, then we will either have duplicates of the same Operation Work Center or Materials added to the wrong Work Center. Either way, it requires a lot of clean up before we can release the production order. Releasing the production order in either state would cause massive confusion in the warehouse and shop floor.
Ideas?