The Variable Labor OH by Qty / Cost is calculated when an operation moves. The prerequisite is that the actual labor cost must be posted against the operation prior to the operation being moved. This makes sense conceptually.
However, for clients that use clock entry and approve clock entry process, the actual labor does not get posted until the next day (or later). The move happens in real time as an operation is completed.
The issue is that since the operation is already moved / completed, the variable labor overhead does not get calculated when the labor is posted. This is a timing issue, and causes the production order to not incorporate the variable labor overheads.
I am curious how other members of the community may have solved for this? Thanks!